Fixed price · Written programme · Friday report

The figure we write down is the figure you pay.

We build houses and small commercial work in and around Kingston. Send a full drawing set and you get one price, one programme with every stage dated, and a report every Friday that you did not have to ask for. If you change the drawing, you sign a variation before we order anything.

Price my drawings See a job on site now

Reinforcement steel tied over the first floor slab of a block house, props still in place underneath
On site now: Beechwood Avenue, Kingston 8. Two-storey block house, 232 m², 30 week programme signed at contract.
What you get
One price, against drawings

Priced in 10 working days from a full set, and the figure holds for 30 days. Everything excluded is listed on the front page, not buried.

What you get
Eight dated stages

The programme is agreed before we break ground, and each stage has a sign-off and a payment percentage. You can read the current one on this page.

What you get
A report every Friday

Done this week, next week, materials, money, and any time lost to rain. Published here as well as emailed, so you can read last week again.

01 / On site now

Every job we have on site, and exactly where each one has got to.

This is the programme from the contract, not a summary written for a website. Each bar is a stage, the stage marked on now is where the job has got to this week, and the payments show what has been released and what is next. If a job is late you will see it here before we tell you in person.

Beechwood Avenue, Kingston 8

Two-storey block house · 232 m²
Contract JMD 41,760,000 · 30 week programme
Started 02 Jul 2026, Nine on site, two subcontract gangs

30 weeks Programme signed at contract
Handover is week 30
  1. 01 / 8 Set out, footings and foundation 3 weeks · 10% of the contract week 1 to 3
  2. 02 / 8 Blockwork to ring beam 5 weeks · 15% of the contract week 4 to 8
  3. 03 / 8 Roof or suspended slab 4 weeks · 15% of the contract week 9 to 12
  4. 04 / 8 Windows, doors and external render 4 weeks · 12% of the contract week 13 to 16
  5. 05 / 8 Plumbing and electrical rough-in 3 weeks · 12% of the contract week 17 to 19
  6. 06 / 8 Plaster, screed and tiling 4 weeks · 14% of the contract week 20 to 23
  7. 07 / 8 Joinery, fittings and paint 4 weeks · 12% of the contract week 24 to 27
  8. 08 / 8 Snag list and handover 3 weeks · 10% of the contract week 28 to 30

All three programmes, with the stage payments Read this week's reports

02 / What building costs here

Our rates, per square metre, published.

A rate is a starting point, not a quotation: your price comes from your drawings. But you should be able to work out whether to keep reading, so here is what we charge and what is in it.

03 / Quoted against final

Every finished job, with the price we quoted beside the price it cost.

This is the only proof that matters, so it is on the site rather than in a folder. Where the two figures differ, the reason is a variation you signed, and it says so.

Norbrook, two-storey house, finished in 2025

Norbrook, two-storey house

Two-storey block house · 268 m² · 2025

Quoted
47,300,000
Final
47,996,000

2 signed variations, JMD 696,000. 32 weeks programmed, 33 taken.

One week late: the porcelain was held at the wharf over a long weekend.

Barbican, one-storey house, finished in 2025

Barbican, one-storey house

One-storey block house · 150 m² · 2025

Quoted
23,250,000
Final
23,250,000

No variations. Nothing changed. 26 weeks programmed, 26 taken.

On the day, on the figure.

Manor Park kitchen and roof, finished in 2024

Manor Park kitchen and roof

Extension and roof replacement · 64 m² · 2024

Quoted
8,640,000
Final
9,012,500

1 signed variation, JMD 372,500. 12 weeks programmed, 12 taken.

Termite damage found when the ceiling came down.

All 6 finished jobs

04 / The Friday report

Last week, on all three jobs.

Every report we have published

05 / Clients

What they say about the invoice.

The contract said 23,250,000 and the last invoice said 23,250,000. I had budgeted a cushion and never touched it, which no one who has built in Kingston expects to say.
Andre, Barbican, one-storey house
They found termites in the rafters, stopped, priced the repair, and waited for my signature. Two days lost and no argument about the bill at the end.
Michelle, Manor Park kitchen and roof
I dropped a partition in week eleven and 330,000 came off the price. I did not have to fight for that credit. It arrived on the final account by itself.
Dr Campbell, Liguanea surgery

All reviews

Next step

Send the drawings. We will price them in 10 working days.

You get a quotation with the fixed sum on the front page, the exclusions listed under it, the eight stages with their dates, and the payment percentage against each one. If the drawings are not finished, tell us and we will say what a range looks like instead of pretending.

Price my drawings +1 876 925 6612

The eight stages and what each one pays

StageWeeksShare
Set out, footings and foundation310%
Blockwork to ring beam515%
Roof or suspended slab415%
Windows, doors and external render412%
Plumbing and electrical rough-in312%
Plaster, screed and tiling414%
Joinery, fittings and paint412%
Snag list and handover310%

Typical weeks for a house. Your programme states your own, and every payment follows a sign-off.