Site cleared, corners set out against the drawings and checked with the surveyor's pegs, footings excavated, steel fixed and inspected, and the foundation poured. Signed off when the engineer has seen the steel before the pour and the levels after it.
Set out, footings and foundation
- Typical weeks
- 3
- Share of the contract
- 10%
- Signed off by
- Engineer, steel before the pour