Waste and supply pipes, conduit, back boxes, distribution board position, and a pressure test on the water lines. Every wall is photographed before it is covered and the photographs go in your file, so in ten years you will know where the pipe runs.
Plumbing and electrical rough-in
- Typical weeks
- 3
- Share of the contract
- 12%
- Signed off by
- Pressure test, wall photographs