A 34 square metre wall face with a drainage blanket behind it, then the driveway poured once the wall had cured. Designed by a structural engineer because the wall is 2.9 metres at the deep end. Two wet weeks in the middle and it still handed over on the Friday it was meant to.
Stony Hill retaining wall and driveway
Retaining wall and paving · 34 m² of wall face · finished 2023