Block laid to the drawing, columns and reinforcement poured in lifts, door and window openings formed to the schedule, and the ring beam cast and checked level. This is the stage where a wrong opening is cheap to fix, so you walk the walls with us before the beam is poured.
Blockwork to ring beam
- Typical weeks
- 5
- Share of the contract
- 15%
- Signed off by
- Client walks the openings